We managed to complete all our fall trail rerouting and bridge building and only added $4000 to our grant to help offset the costs of these trail improvements. Here are some of the details:
- Excavation costs = $4700
- 4 concrete blocks for the bridge foundation = $400
- Semi Trailer for the bridge = $1700
- Pressure treated bridge materials = $3100
- Volunteer labor